Construction Sequence
This is a rough sequence of events for the construction of your home. Some things are not on the 'critical path' and get moved around a bit so this is not set in stone. Please use this as a general overview of what goes on to bring your dream to a reality.
General
Building Permit, Water Permit, Survey
Pre-Construction Site work
Site Clearing, Pre-Construction Grading, Stake House
Foundation
Dig and Pour Footings, Build Foundation, Termite Treatment, Slab/Flooring
Framing
Floor Framing, Wall Framing, Roof Framing, Windows and Doors, Roofing
Mechanical
Light Fixtures, Rough Plumbing, Rough Electrical, Rough HVAC
Interior Rough
Insulation, Drywall, Interior Trim, Cabinets and Countertops, Painting, Fireplace
Interior Finish
Flooring, Bath Accessories, Shelving, Mirrors, Door Hardware, Appliances, Cleaning
Exterior Finish
Siding/Brick, Porches/Decks, Gutters
Post Construction Site Work
Exterior Concrete, Driveway, Post Construction Grading, Landscaping